Chesapeake Property Flip
Complete remodel.
Master Bath:
- Install water tight recessed light over shower
- Run wire to switch/light for Vanity
- Run / install exhaust fan
- Install one piece 36 stand up shower surround
- Install tile on 45 cut
Hall Bath:
- Replace  exhaust fan with new, relocate
- Run / install GFI outlet off existing circuit
- Run / install high hat (will need to cut out sheet rock, replace and install recessed lighting, same switch as fan)
- Install 5′ tub -replace bottom of rotted 2x 4 and 1foot square piece of plywood
- Replace plastic couplings X 2 in hall bath
- Rework Valves in both bathrooms
Kitchen:
- Add 2 recessed and rework 3 existing
- Fix receptacle lines not passing through top plate in removed soffit
- Rewire microwave line / GFI counter outlets see
Master Closet:
- Install light and light switch (exterior)
Garage:
- Bring Panel box to code
- run new circuit and install light fixture in laundry area
Misc:
- Install new Sheetrock
- Install 10 new interior doors
- Install new exterior front door
- replace 2 x 6 rotted garage trim
- Painting Interior
| Before | After |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
![]() ![]() ![]() ![]() ![]() ![]() |
Outside Receptacle and garden receptacle
Written by Kevin : Posted on January 24, 2011 : Comments Off on Outside Receptacle and garden receptacle
Installed outside receptacle on exterior of home, tapped into new receptacle and ran to another receptacle in a garden located in middle of front yard.
| Before | After |
![]() |
![]() |
Fan replacement, 3″ to 4″ box upgrade
Written by Kevin : Posted on January 24, 2011 : Comments Off on Fan replacement, 3″ to 4″ box upgrade
Removed ceiling fan in kitchen and found to be supported by 3″ box. Replaced 3″ box with 4″ box and installed new fan. Also, installed new ceiling light fixture over sink.
| Before | During | After |
![]() |
![]() |
![]() |
![]() |